Wed 30 Apr 2008
Had Clyde Owens from “Pacific Log Homes” (Link to his site here on Blog) out the past two days to bust out the main part of our interior staining with me.(Interior Logs and Ceilings) Two long hard days with both of us running sprayers and back-brushing our own work we knocked er’ out! Thanks Again Clyde!!
Wanted to get all of our main interior stained now rather than tape off and cover all of our finish items like granite, finished cabinets, etc. later down the road. All of our interior walls will be finished with pine board and batt (No sheet rock here on our place)… I’ll pre-stain it on the ground and then put it up.
All of our Interior Framing is done now too other than the small interior gable end wall where HVAC Heat Echange Unit is.
:-)

View of our Dining Room’s logs and ceiling all stained… We used “Perma-Chink’s” Light Natural for our interior stain color and finished of with “Perma-Chink’s” Satin finish and sealer.

View of Kitchen Ceiling’s 4″ X 10″ rafters and 2″X 8″ T&G Pine all stained.

View from Kitchen looking towards Guest Bedroom and Laundry Room.

View from Kitchen towards Pantry, under stairs, and Living Room / Great Room.

View looking at Living Room / Great Room from Kitchen. (Walking Ya’ around house here now… Stay with me)

View back towards Kitchen and Dining Room from Living Room / Great Room.

Great Room Ceiling looking up and East from front door.

Looking up and towards the West and Master Bedroom from Great Room’s front front door.

Same view of Upstairs, taken at a different angle from Great Room.

View from upstairs looking back down towards Great Room.

View from upstairs landing looking into our daughter Anjelika’s bedroom.

View looking into Master Bedroom from top stair landing.
… Got that ball rolling and its all down hill from here… We can finally see the light at the end of the tunnel!! :-)
Leave a Reply
You must be logged in to post a comment.