Wed 30 Apr 2008
We now have all of our HVAC (Forced air heating and Air Conditioning) and Plumbing going in now…. Getting a little held up by our plumbers, but everything else is moving right along towards the completion of our Log Home! Wahoooo!!!

Good friend Tom has designed and is in the process of installing all of our HVAC for us. Thank You again Tom!

HVAC Duct running through upstairs flooring. On top of our exposed from below, 4 X 10 second floor joists covered with 2 X 8 T&G Pine, we ran 2X6’s on edge so we had room to insulate our floors for noise and run all of our Plumbing, HVAC Ducts and Electrical wiring.

Our HVAC Heat Exchange Unit goes above our Master Bathroom on the 2nd floor and all the Ducts run down from there. The actual unit is suspended from the ceiling so we dont ever hear it while taking a bath.

HVAC Ducts running down through Stud bays from above Master Bathrroom.

2 X 6 2nd floor joisting on top of 2X8 T&G showing HVAC Duct Run all insulated with 2″ foam board insulation for sound barrier…. Duct work for this run started in Pic.

Here’s a pic of our plumbing vent and drain pipes going in.

Our Plumbing finally going in!
Should be finished up with Rough Plumbing and HVAC and started on our Elecrical by the end of this coming weekend.