We’re totally dried in now and working on the inside of our log home now! :-)… All of our Exterior Doors are in, Floor is all joisted out and decked, most of the 1st Floor Interior Walls are all framed, and we got our Stairs framed in this weekend! :-)

All Dried in including Exterior Doors

Totally Dried In, including all exterior doors! :-) We even have a little space heater in our log home definately keeping the inside warmer than the outside! ;-)

View of our Master Bedroom French Doors

View of French Doors and Deck off of Master Bedroom :-)

1stFlJoistedJan15th08

We got our 1st Floor all Joisted out on Jan 15th, 2008… Now it has already been decked off and we’re framing interior walls. :-)

Stairs all framed in

Have almost all of our 1st Floor Walls Framed in and we got our Stairs framed in this past Sat. :-)

1st Floor Interior Walls framed in

We now have just about all of our 1st floor walls framed in and our tubs and showers delivered and in place… just have some blocking to do and then a couple of small pony walls and its on to the 2nd floor framing. :-)